|
|
|
|
|
Marina Vista
303 Pennsylvania Avenue - Sheboygan, WI |
Bank First
National
2600 Kohler Memorial Drive - Sheboygan, WI |
This luxury condominium building is a 60,000
square foot building with twenty-one units and underground parking.
The four story building rests on pilings and poured concrete
foundations. The main building construction is panelized wood
framed with various interior and exterior finishes.
|
The new bank building is the “flag ship”
for Bank First National Bank. The building interior incorporates
upscale finishes including stone veneers, granite countertops,
mahogany panels and trim and much more. The building exterior
has a great modern look as well with full stone veneer and composite
panels.
|
|
|
Sheboygan Chrysler Center
2701 Washington Avenue - Sheboygan,
WI
|
Fire Station
#5
4504 S 18th Street - Sheboygan, WI |
This project is a great example of how a
new façade can really dress up a building. The new EIFS
wall finish is a welcome change from the old metal wall panel
that used to greet customers.
|
Sheboygan’s newest fire station is
a 5000 square foot structure composed of traditional wood framing
along with concrete block construction. The exterior of the
building is designed to blend in with its residential surroundings
using cement board siding, split face block, and a shingled
roof.
|